References

Customer
DMK Baby Strückhausen GmbH

Turnaraound
02/2016 - 02/2017

Scope
Energy generation, steam supply, heating, ventilating and sanitary facilities, cooling systems, compressed air supply, instrumentation, control and automation (ICA Technology), process management systems

Technical features
Construction planning, installation and commissioning of all technical building systems, process management systems and energy center for the new factory for baby food in Strückhausen. This includes, among others, two high-pressure steam generators with a steam capacity of 16 t/h each and an operating pressure of 30bar as well as CHP with an electrical power of 1,500 kW.

Customer
MS Spaichingen GmbH

Turnaround
12/2014 - 12/2015

Scope

Heating, ventilating and sanitary facilities; cooling systems; energy generation, compressed air supply; electrical systems

Technical features
Technical general contractor for the new headquarters with production and administration building in Trossingen.

Customer
BMW AG

Turnaround
09/2015 - 11/2015
05/2015 - 09/2017

Scope
Cooling systems; compressed-air and industrial gas supply; electrical systems

Technical features
Renovation of the technical systems in the plant in Dingolfing, buildings 34.0 and 34.1

Customer
Kaeser Kompressoren SE

Turnaround
03/2016 - 05/2018

Scope
Instrumentation, control, and automation (ICA technology)

Technical features

Supply, installation and commissioning of all instrumentation, control and automation systems (field units, control cabinets, approx. 180 fields, DDC hardware, approx. 5,000 DP, wiring). Implementation of the programming and building management systems in the media supply areas (cooling water, cold water, compressed air, PST-Fan) of 28 “end of line” test benches for compressors of different sizes. The test cycle can be specified according to variable parameters such as quantity, temperature, and pressure.


Customer
AUDI AG

Turnaround
07/2015 - 08/2017

Scope
Heating, ventilating, and sanitary facilities; cooling systems; compressed air supply; cooling ceilings

Technical features
In the AUDI Design Center concepts and models of the cars of tomorrow are designed and presented to the board.

The building has six floors, consisting of workshops, modeling workstations, studio sections and administration areas


Customer
Porsche AG / DAL

Turnaround
02/2017 - 10/2017

Scope
Heating and sanitary facilities; cooling systems; ventilation and air-conditioning; instrumentation, control, and automation (ICA technology)

Technical features
Installation of the technical building systems in Eichwald / Sachsenheim for two new logistic halls, buildings 20 and 60

Customer
AUDI AG

Turnaround
Ongoing project

Scope
Heating and sanitary facilities; cooling systems

Technical features
Installation of heating and sanitary facilities; cooling systems in Ingolstadt, building T24 

Customer
Immobilienfonds Köln-Ossendorf-Hürth GbR

Turnaround
02/2015 - 07/2015

Scope
Cooling systems

Technical features
Renovation of cooling systems and the associated structural measures including the power supply in the “Coloneum” TV and film-studio complex during ongoing operation of the studio.

  • Cooling capacity: 2,400 kW
  • Power supply: 1,000 kW

Customer
BMW AG

Turnaround
Ongoing project

Scope
All technical building services and instrumentation, control, and automation (ICA technology)

Technical features
Maintenance and repair of the plants in Dingolfing and Munich

Customer
BMW AG

Turnaround
11/2014 - 03/2016

Scope
Refrigeration chamber; cooling and ventilation system; dryer; instrumentation, control, and automation (ICA technology); purge systems; exhaust extraction; HC-CO (hydrocarbon-carbon monoxide); sprinkler system; alarm system; electrotechnical facilities; altitude simulation

Technical features
Construction of two additional soak and conditioning chambers to show as realistic as possible the cooling behavior of a vehicle in building 78.1 (EVZ). In addition, the altitude simulation system was recalibrated and the control system optimized.

Customer
BMW AG

Turnaround
10/2015 - 08/2017

Scope
Instrumentation, control, and automation (ICA technology)

Technical features
Upgrade of five exhaust gas test chambers in plant 1.40 (UPZ). Modification and partial replacement of the instrumentation, control, and automation systems (control cabinet, DDC hardware and software, wiring, commissioning) to enable safety-oriented test bench operation. Conversion of the safety technology to a safety PLC.

Customer
Infineon Technologies AG

Turnaround
Ongoing project

Scope
All technical building services and instrumentation, control, and automation (ICA technology)

Technical features

Maintenance and repair of the company headquarters


Customer
Rehau AG & Co. KG

Turnaround
12/2015 - 06/2016

Scope
Electrical systems

Technical features

Construction of a new paint shop and logistics center in the plant in Viechtach.


Customer
BMW AG

Turnaround
07/2014 - 05/2016

Scope
Electrical systems

Technical features

Renovation of electrical systems in the plant in Dingolfing, building 50


Customer
BMW AG

Turnaround
01/2015 - 12/2015

Scope
Heating and sanitary facilities, cooling systems, compressed air

Technical features

Renovation and extension of the engine test benches for H2 fuel cell engines and new refueling test benches in plant 1.50, building 75.3 and FIZ BA 6.3

Customer
MAN SE

Turnaround
Ongoing project

Scope
All technical building services and instrumentation, control, and automation (ICA Technology)

Technical features

Maintenance and repair of the plant in Augsburg

Customer
Volkswagen AG

Turnaround
05/2015 - 11/2016

Scope
Heating, ventilation, and sanitary facilities; cooling system; compressed air supply

Besonderheiten
Umbau der TGA Anlagen in der Halle 100 im laufenden Betrieb. Bruttogeschossfläche über 213.000m².

Customer
Montanwerke Brixlegg AG, Brixlegg (Austria)

Turnaround
09/2015 - 11/2016

Scope
IIndustrial air technology, engineering services, and plant construction

Technical features

Design and construction of exhaust pipework including the required steel construction. Flow-optimized collection device for a converter heater.

Customer
Buderus Guss GmbH

Turnaround
10/2015 - 06/2017

Scope
Industrial air technology, engineering Services

Technical features

Preparation of a ventilation concept to reduce diffuse emissions from an iron foundry for passenger car brake disks. During concept design, the high standards of the “Technical Instructions on Air Quality Control” (TA-Luft) were observed. During a subsequent feasibility study further tests were conducted for selected measures.

Customer
Real Alloy Norway SA

Turnaround
02/2016 - 06/2016

Scope
Industrial air technology, optimization concept, and components

Technical features

Design and construction of exhaust systems including the required steel construction. Collection of dust and odor loads from the loading of salt slag of the aluminum production by means of the ETS-nozzle series collection element. Calculation of the collection volume flow based on a previous emissions analysis (air current-state analysis).

Customer
Philips Medical Systems DMC GmbH

Turnaround
03/2016 - 03/2017

Scope
Industrial air technology, optimization concept, and components

Technical features

Optimization of exhaust hoods in a glass-blowing workshop in two steps:

  • Step 1:
    Implementation of an air current-state analysis and preparation of a supply and exhaust air concept
  • Step 2:
    Implementation of the supply and exhaust air concept. Delivery and installation of type ETS-Jetline exhaust air collection elements including modification of the exhaust air network and subsequent workplace measurements.

Customer
Volkswagen AG

Turnaround
03/2015 - 08/2015

Scope
Industrial air technology, optimization concept, and components

Technical features

Engine first start of vehicles “Transporter T6” on a drag chain. Extraction of the engine exhaust gases by means of ETS type VORTEX collection elements including appropriate throttle system and directional controls.

Customer
MS Spaichingen GmbH

Turnaround
12/2014 - 09/2015

Scope
Heating and cooling systems, energy supply

Technical features
New construction of an energy center for the plant in Zittau.

A combination of a CHP and absorption chiller is used.

Customer
Schaeffler Technologies AG & Co. KG

Turnaround
09/2016 - 02/2018

Scope
Heating and cooling systems, energy supply

Technical features
Construction of three new energy centers at the site in Herzogenaurach.

A combination of a CHP and absorption chiller is used.

Customer
Athos GmbH

Turnaround
07/2014 - 05/2015

Scope
Heating and cooling systems, energy supply

Technical features

Renovation and optimization of technical plants and systems in the office and administration
building on Rosenheimer Platz in Munich.

Customer
China North Engine R.I.

Turnaround
12/2015 - 08/2017

Scope
Test bench technology

Technical features
Design, construction and installation of a climatic and altitude simulation system

  • Temperature range: -45°C to +30°C
  • Humidity control: 20% to 90% relative humidity
  • Altitude control: up to 5,000m above sea level

Customer
SAIC Motor Commercial Vehicle Technical Center

Turnaround
11/2015 - 11/2016

Scope
Test bench technology

Technical features
Desig, construction and installation of a climatic and full-spectrum sun simulation.

  • Temperature range: -40°C to +60°C
  • Humidity control: 30% to 90% relative humidity
  • Vehicle speeds: up to 180km/h

Customer
FAW Haima Automobile CO., LTD

Turnaround
01/2016 - 03/2017

Scope
Test bench technology

Technical features
Design, construction and installation of a climatic and infrared sun simulation system

  • Temperature range: -40°C to +60°C
  • Humidity control: 30% to 95% relative humidity
  • Vehicle speeds: up to 180km/h